Power Outage in Pennyville, Johannesburg
Power Outages Affecting Pennyville2 active
Updated 5m ago- Reported - Tue, 17 Nov, 16:31A power outage is affecting customers in Pennyville and Noordgesig, and operators have been notified to investigate at Pennyville Substation.source
- Reported - Tue, 17 Nov, 20:46Operators have been notified and will be dispatched to investigate the cause of the outage affecting customers in Pennyville and Noordgesig.source
- Update - Thu, 19 Nov, 13:56Technical teams are on site investigating the cause of an outage affecting customers in Pennyville and Noordgesig, with further details and an estimated time of restoration to be communicated.source
- Reported - Thu, 19 Nov, 11:46There is an emergency isolation at Fordsburg Substation.source
- Reported - Thu, 19 Nov, 12:41An outage at Fordsburg Substation, affecting the Orlando/Pennyville/Mayfair Feeder, is impacting customers in Devland, Lenasia Extensions 3 to 13, Kliptown, Klipspruit, Klipspruit West (all extensions), Eldorado Park (all extensions), Nancefield Industrial, Power Park, and Pimville Zone 9.source
- Update - Thu, 19 Nov, 13:35There is an update regarding Fordsburg Substation.source


How long outages like this took
Unplanned outages in Pennyville usually took about 6 hours to restore. Half of the 10 on record took between 3 and 20 hours (records since May 2026).
Measured from when the outage was first reported to when City Power confirmed power was restored, so the actual time without power may differ. A guide from past outages, not an estimate for this one.
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Pennyville directly.
Johannesburg Power Outages Today3 active
Updated 5m ago- Reported - Thu, 19 Nov, 21:36Operators are investigating the cause of an outage affecting customers in Craighall Park, reported this evening.source
- Update - Fri, 20 Nov, 00:19Power has been restored up to 98% to customers in Craighall Park, with one load center remaining off until repairs are complete, following a cable fault reported yesterday.source
- Update - Fri, 20 Nov, 10:31A faulty cable has been located at Parkhurst Substation, and repairs are being carried out affecting customers in Parktown North along 4th and 11th Avenue.source
- Update - Fri, 20 Nov, 15:35Restoration efforts remain over 90% complete at Parkhurst Substation, with trenching for cable laying and material arrangement underway, following an outage on Thursday, 19 November 2026, affecting customers in Parktown North along 4th and 11th Avenue, and parts of Craighall Park.source
- Update - Fri, 20 Nov, 15:46Restoration efforts are over 90% complete at Parkhurst Substation, affecting customers in Parktown North and Craighall Park.source
- Update - Fri, 20 Nov, 15:46Restoration efforts are over 90% complete at Parkhurst Substation, affecting customers in Parktown North and Craighall Park.source
- Update - Fri, 20 Nov, 21:23Our team is sourcing materials for repairs that will commence tomorrow morning for the outage affecting customers in Craighall Park and Parktown North.source
- Reported - Fri, 20 Nov, 13:10A power disruption from the Amalgam standby distributor is affecting customers in Amalgam, Auckland Park, Santech, Crown, Homestead Park, Pageview, Mayfair, and Vrededorp, with multiple technical teams investigating.source
- Update - Fri, 20 Nov, 17:33City Power continues extensive repairs to restore remaining Mayfair customers.source

Report a Power Outage in Pennyville
Is your power off in Pennyville? Report it to City Power so they can dispatch a team.
Planned Maintenance in Pennyville
Johannesburg Power Outages Today1 planned
Updated 5m ago

When Will Electricity Come Back in Pennyville?
How long a power outage in Pennyville takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Typical unplanned outage across Johannesburg: about 10 hours. About half are back within 8 hours; about a third take more than a day.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Pennyville residents in advance. Usually 6-10 hours during the day.
Power Outage History for Pennyville (Last 90 Days)
City Power reported 13 outages affecting Pennyville in the last 90 days. Most faults traced back to the Pennyville Substation substation (7 of 13). The most common cause was cable fault.
| Date | Time to restoration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 06 Nov 2026 | 1.2d | Pennyville Substation | overhead line | Noordgesig |
| 03 Nov 2026 | - | Pennyville Substation | illegal connection | - |
| 31 Oct 2026 | 2.5h | Pennyville Switching Station | overload | - |
| 10 Oct 2026 | 5.8h | Orlando Switching Station | planned maintenance | Industria, Bosmont, Crown, Amalgam +7 more |
| 08 Oct 2026 | 5.7h | - | burnt transformer | - |
| 07 Oct 2026 | - | - | - | Noordgesig |
| 29 Sept 2026 | 1.1h | Pennyville Substation | overhead line fault | Noordgesig, Hursthill |
| 24 Sept 2026 | - | Pennyville Substation | cable fault | Noordgesig |
| 24 Sept 2026 | 21.2h | Pennyville Substation | flashover incident | Noordgesig |
| 23 Sept 2026 | - | - | - | Noordgesig |
Time to restoration is measured from when the outage was first reported, not from when it began.
What to Do During a Power Outage in Pennyville
Quick checklist to follow while waiting for City Power to restore power in Pennyville.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Pennyville
Is there a power outage in Pennyville right now?
Yes, there is currently a power outage reported in Pennyville, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.
How do I report a power outage in Pennyville?
Call City Power on 0114907484 / 0860562874 to report a power outage in Pennyville. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Pennyville?
Measured from City Power's own notices since April 2026, the typical unplanned outage in Johannesburg took about 10 hours from first report to confirmed restoration. About half were back within 8 hours, but about a third took more than a day, usually cable faults or equipment damage. Planned maintenance usually runs within the window City Power announces.
When will the electricity be back on in Pennyville?
For the active outage affecting electricity in Pennyville, see the live update at the top of this page for City Power's latest restoration estimate. Across Johannesburg, the typical unplanned outage took about 10 hours to restore, and about a third took more than a day. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.
Is it load shedding or a power outage in Pennyville?
If your power is off outside the load shedding schedule, Pennyville is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Pennyville load shedding schedule
What number do I call for City Power in Pennyville?
Call City Power on 0114907484 / 0860562874 for power outages in Pennyville. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
- Pennyville Load Shedding Schedule
- All Johannesburg Power Outages Today
- Johannesburg Power Outage History
- Power Outage Information South Africa
Nearby Areas
Click here to join our telegram channel and stay up to date with load shedding and related news!