Power Outage in Noordgesig, Johannesburg
Power Outages Affecting Noordgesig1 active
Updated 10m ago- Reported - Tue, 17 Nov, 16:31A power outage is affecting customers in Pennyville and Noordgesig, and operators have been notified to investigate at Pennyville Substation.source
- Reported - Tue, 17 Nov, 20:46Operators have been notified and will be dispatched to investigate the cause of the outage affecting customers in Pennyville and Noordgesig.source
- Update - Thu, 19 Nov, 13:56Technical teams are on site investigating the cause of an outage affecting customers in Pennyville and Noordgesig, with further details and an estimated time of restoration to be communicated.source
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Noordgesig directly.
Johannesburg Power Outages Today3 active
Updated 10m ago- Reported - Thu, 19 Nov, 21:36Operators are investigating the cause of an outage affecting customers in Craighall Park, reported this evening.source
- Update - Fri, 20 Nov, 00:19Power has been restored up to 98% to customers in Craighall Park, with one load center remaining off until repairs are complete, following a cable fault reported yesterday.source
- Update - Fri, 20 Nov, 10:31A faulty cable has been located at Parkhurst Substation, and repairs are being carried out affecting customers in Parktown North along 4th and 11th Avenue.source
- Update - Fri, 20 Nov, 15:35Restoration efforts remain over 90% complete at Parkhurst Substation, with trenching for cable laying and material arrangement underway, following an outage on Thursday, 19 November 2026, affecting customers in Parktown North along 4th and 11th Avenue, and parts of Craighall Park.source
- Update - Fri, 20 Nov, 15:46Restoration efforts are over 90% complete at Parkhurst Substation, affecting customers in Parktown North and Craighall Park.source
- Update - Fri, 20 Nov, 15:46Restoration efforts are over 90% complete at Parkhurst Substation, affecting customers in Parktown North and Craighall Park.source
- Update - Fri, 20 Nov, 21:23Our team is sourcing materials for repairs that will commence tomorrow morning for the outage affecting customers in Craighall Park and Parktown North.source
- Update - Sat, 21 Nov, 12:5498% of the power supply has been restored to customers in Craighall Park and Parktown North, with repairs underway for the remaining 2%.source
- Reported - Fri, 20 Nov, 13:10A power disruption from the Amalgam standby distributor is affecting customers in Amalgam, Auckland Park, Santech, Crown, Homestead Park, Pageview, Mayfair, and Vrededorp, with multiple technical teams investigating.source
- Update - Fri, 20 Nov, 17:33City Power continues extensive repairs to restore remaining Mayfair customers.source

Report a Power Outage in Noordgesig
Is your power off in Noordgesig? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Noordgesig?
How long a power outage in Noordgesig takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Typical unplanned outage across Johannesburg: about 10 hours. About half are back within 8 hours; about a third take more than a day.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Noordgesig residents in advance. Usually 6-10 hours during the day.
Power Outage History for Noordgesig (Last 90 Days)
City Power reported 10 outages affecting Noordgesig in the last 90 days. Most faults traced back to the Pennyville Substation substation (5 of 10). The most common cause was cable fault.
| Date | Time to restoration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 06 Nov 2026 | 1.2d | Pennyville Substation | overhead line | Pennyville |
| 11 Oct 2026 | - | - | - | - |
| 07 Oct 2026 | - | - | - | Pennyville |
| 29 Sept 2026 | 1.1h | Pennyville Substation | overhead line fault | Pennyville, Hursthill |
| 24 Sept 2026 | - | Pennyville Substation | cable fault | Pennyville |
| 24 Sept 2026 | 21.2h | Pennyville Substation | flashover incident | Pennyville |
| 23 Sept 2026 | - | - | - | Pennyville |
| 23 Sept 2026 | - | - | - | Pennyville |
| 18 Sept 2026 | - | - | vandalism | - |
| 27 Aug 2026 | - | Pennyville Substation | cable fault | Pennyville |
Time to restoration is measured from when the outage was first reported, not from when it began.
What to Do During a Power Outage in Noordgesig
Quick checklist to follow while waiting for City Power to restore power in Noordgesig.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Noordgesig
Is there a power outage in Noordgesig right now?
Yes, there is currently a power outage reported in Noordgesig, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.
How do I report a power outage in Noordgesig?
Call City Power on 0114907484 / 0860562874 to report a power outage in Noordgesig. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Noordgesig?
Measured from City Power's own notices since April 2026, the typical unplanned outage in Johannesburg took about 10 hours from first report to confirmed restoration. About half were back within 8 hours, but about a third took more than a day, usually cable faults or equipment damage. Planned maintenance usually runs within the window City Power announces.
When will the electricity be back on in Noordgesig?
For the active outage affecting electricity in Noordgesig, see the live update at the top of this page for City Power's latest restoration estimate. Across Johannesburg, the typical unplanned outage took about 10 hours to restore, and about a third took more than a day. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.
Is it load shedding or a power outage in Noordgesig?
If your power is off outside the load shedding schedule, Noordgesig is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Noordgesig load shedding schedule
What number do I call for City Power in Noordgesig?
Call City Power on 0114907484 / 0860562874 for power outages in Noordgesig. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
- Noordgesig Load Shedding Schedule
- All Johannesburg Power Outages Today
- Johannesburg Power Outage History
- Power Outage Information South Africa
Nearby Areas
Click here to join our telegram channel and stay up to date with load shedding and related news!