Power Outage in Greymont, Johannesburg
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Greymont directly.
Johannesburg Power Outages Today1 active
Updated 14m ago- Update - Tue, 19 May, 22:21Rosebank Distributor tripped affecting customers in Saxonwold, Parkwood. Operators are currently on site busy with investigations.source
- Update - Wed, 20 May, 03:14The cause of the outage affecting customers in Saxonwold, Parkwood has been identified as a cable fault; supply has been partially restored, however one load centre remains off until repairs are completed.source
- Update - Wed, 20 May, 16:08Forest Town Switching Station, Rosebank Distributor: The team is currently in the process of procuring the required materials to complete the necessary repairs.source
- Update - Thu, 21 May, 15:55The team has initiated an alternative restoration strategy involving the replacement of the entire MV cable due to additional faults, affecting customers along Erlswold Way in Saxonwold.source
- Update - Fri, 22 May, 12:06The team is awaiting a generator and procuring specialized materials to commence with temporary supply connection and necessary repairs following multiple cable faults, affecting customers along Erlswold Way in Saxonwold.source
- Update - Fri, 22 May, 14:02The generator has arrived on site for temporary supply connection, and materials are being sourced for repairs following multiple cable faults, affecting Erlswold Way in Saxonwold.source


Report a Power Outage in Greymont
Is your power off in Greymont? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Greymont?
How long a power outage in Greymont takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Most outages in Greymont fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Greymont residents in advance. Usually 6-10 hours during the day.
Power Outage History for Greymont (Last 90 Days)
City Power reported 3 outages affecting Greymont in the last 90 days, totalling 154.5 hours without power. Average restoration time was 51.5 hours. Most faults traced back to the Hursthill Substation substation (3 of 3). The most common cause was cable fault.
| Date | Duration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 02 May 2026 | 4.3h | Hursthill Substation | cable fault | Northcliff |
| 27 Apr 2026 | 1.6d | Hursthill Substation | flashed indoor Ring Main Unit | Coronationville, Westbury, Newclare, Newlands +2 more |
| 24 Apr 2026 | 4.7d | Hursthill Substation | needs oil top up | Newlands, Claremont, Hurst Hill, Westbury +3 more |
What to Do During a Power Outage in Greymont
Quick checklist to follow while waiting for City Power to restore power in Greymont.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Greymont
Is there a power outage in Greymont right now?
No power outage is currently reported by City Power for Greymont, Johannesburg. This page updates every 10 minutes with live data from City Power. If your power is off, report it by calling 0114907484 / 0860562874.
How do I report a power outage in Greymont?
Call City Power on 0114907484 / 0860562874 to report a power outage in Greymont. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Greymont?
Most unplanned power outages in Greymont are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.
When will the electricity be back on in Greymont?
City Power has not logged an active electricity outage in Greymont right now. If your power is off, the issue may be local to your street or property. Call 0114907484 / 0860562874 or check this page again - it updates every 10 minutes with live electricity restoration data from City Power.
Is it load shedding or a power outage in Greymont?
If your power is off outside the load shedding schedule, Greymont is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Greymont load shedding schedule
What number do I call for City Power in Greymont?
Call City Power on 0114907484 / 0860562874 for power outages in Greymont. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
Click here to join our telegram channel and stay up to date with load shedding and related news!