Updated 3m ago- Update - Fri, 31 Jul, 09:27Teams are on site repairing damaged breakers and cables inside the Transformer Switching Station at Hursthull Substation, affecting customers on Ackerman, Rorich, Charles, Oosthuizen and Aldred streets in Newlands due to an overload.source
- Update - Fri, 31 Jul, 11:56Repairs on damaged breakers and cable at Hursthull Substation are finalised, with operators now preparing for final checks and supply restoration, affecting customers on Ackerman, Rorich, Charles, Oosthuizen, and Aldred streets in Newlands.source
- Restored - Fri, 31 Jul, 12:20Full power supply has been restored to customers on Ackerman, Rorich, Charles, Oosthuizen and Aldred streets in Newlands following repairs on breakers and cable inside the transformer switching station.source
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Newlands directly.
Johannesburg Power Outages Today6 active
Updated 3m ago- Reported - Wed, 05 Aug, 05:58Operators are en-route to investigate the loss of power supply affecting Mayfair and surrounding areas from Mayfair Substation, Amalgam Standby 11kv distributor.source
- Update - Wed, 05 Aug, 09:54A cable fault between HVC 263 and HVC 182 at Mayfair Substation's Amalgam Standby 11kv distributor is affecting customers in Vrededorp and Pageview, with two load centres remaining off.source
- Update - Wed, 05 Aug, 10:07An outage at Mayfair Substation's Amalgam Standby 11kv distributor is affecting customers in Vrededorp and Pageview due to a cable fault.source
- Update - Wed, 05 Aug, 11:40The technical team has located a cable fault between HVC 263 and HVC 182 affecting Pageview and Vrededorp customers, and is preparing for repairs.source
- Update - Wed, 05 Aug, 11:55The repair of a cable fault affecting Pageview and Vrededorp customers is delayed due to a water leak in the area.source
- Update - Thu, 06 Aug, 13:08Technical teams are on standby to begin cable repairs affecting customers in Vrededorp and Pageview after water is drained and the leaking pipe is repaired.source
- Update - Thu, 06 Aug, 09:45A cable fault between MSS N798 and the TSS in the Zoo area is being investigated, with material for repairs to be sourced once the fault is located.source
- Update - Thu, 06 Aug, 10:20A test branch is on site to locate a cable fault between the MSS N798 and the TSS in the Zoo area, with further updates to follow.source
- Update - Thu, 06 Aug, 10:44A cable fault has been located next to MSS N798 in the Zoo area, affecting the Parkwood 15 11kV distributor from Forest Town Switching Station. The team is sourcing material for repairs.source
- Reported - Thu, 06 Aug, 07:08Operators are investigating an unplanned power outage affecting the Johannesburg Zoo and surrounding areas in Parkview, caused by the Forest Town Switching Station's Parkwood 11kV distributor.source
- Reported - Thu, 06 Aug, 07:12Operators are investigating an unplanned power loss affecting the Johannesburg Zoo and Parkview due to a fault at Forest Town Switching Station, Parkwood 11kV distributor.source
Report a Power Outage in Newlands
Is your power off in Newlands? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Newlands?
How long a power outage in Newlands takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Most outages in Newlands fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Newlands residents in advance. Usually 6-10 hours during the day.
Power Outage History for Newlands (Last 90 Days)
City Power reported 10 outages affecting Newlands in the last 90 days, totalling 182 hours without power. Average restoration time was 30.3 hours. Most faults traced back to the Hursthill Substation substation (8 of 10). The most common cause was cable fault.
| Date | Duration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 26 Jul 2026 | - | Newlands Substation | burnt cables | - |
| 22 Jul 2026 | 0m | Hursthill Substation | damaged cables and breakers | Claremont |
| 21 Jul 2026 | - | Hursthill Substation | cable fault | Claremont |
| 17 Jul 2026 | 2.5h | Orlando Switching Station | - | Triomf, Claremont, Sunnyside, Westdene +9 more |
| 09 Jul 2026 | 0m | Hursthill Substation | breaker fault | Claremont |
| 01 Jul 2026 | 7.1d | Hursthill Substation | low voltage cable faults and damaged breakers | Claremont |
| 24 Jun 2026 | - | Hursthill Substation | burnt transformer | Hurst Hill |
| 23 Jun 2026 | 0m | Hursthill Substation | equipment fault | Hurst Hill |
| 18 Jun 2026 | - | Hursthill Substation | equipment fault | - |
| 05 Jun 2026 | 9.3h | Hursthill Substation | cable fault | Coronationville, Westbury, Claremont, Northcliff +4 more |
What to Do During a Power Outage in Newlands
Quick checklist to follow while waiting for City Power to restore power in Newlands.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Newlands
Is there a power outage in Newlands right now?
No power outage is currently reported by City Power for Newlands, Johannesburg. This page updates every 10 minutes with live data from City Power. If your power is off, report it by calling 0114907484 / 0860562874.
How do I report a power outage in Newlands?
Call City Power on 0114907484 / 0860562874 to report a power outage in Newlands. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Newlands?
Most unplanned power outages in Newlands are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.
When will the electricity be back on in Newlands?
City Power has not logged an active electricity outage in Newlands right now. If your power is off, the issue may be local to your street or property. Call 0114907484 / 0860562874 or check this page again - it updates every 10 minutes with live electricity restoration data from City Power.
Is it load shedding or a power outage in Newlands?
If your power is off outside the load shedding schedule, Newlands is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Newlands load shedding schedule
What number do I call for City Power in Newlands?
Call City Power on 0114907484 / 0860562874 for power outages in Newlands. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
Click here to join our telegram channel and stay up to date with load shedding and related news!