Power Outage in Buamja, North West
Power outage in Buamja
- Since
- 20:11
- Cause
- tripped line
- Estimated back
- Not given
- Last update
- None yet
Checked Eskom at 21:23 SAST
Current power outage affecting Buamja
There is a power outage affecting Tlhabane, Phokeng, Buamja, and Lefaragatla due to a tripped line. Teams are on-site.
Report a Power Outage in Buamja
Is your power off in Buamja and it is not load shedding? Report it to Eskom so they can dispatch a team.
When Will Electricity Come Back in Buamja?
- Unplanned fault
- Most outages in Buamja restore within 4-8 hours; a tripped feeder in 2-4 hours.
- Cable theft / vandalism
- 12-48 hours where a substation or mini-sub must be repaired.
- Storm damage
- Depends on access and number of faults; widespread damage can take over a day.
Frequently Asked Questions About Power Outages in Buamja
Is there a power outage in Buamja right now?
Yes, a power outage is currently reported in Buamja. See the live status above for the latest cause and any restoration estimate.
How do I report a power outage in Buamja?
Call Eskom on 08600 37566, via Eskom’s “Alfred” WhatsApp on 0860 037 566, or the MyEskom Customer app. Give your account number and address.
When will the electricity be back on in Buamja?
See the live status above for the latest estimate. Most unplanned outages restore within 4-8 hours; faults needing equipment replacement can take 12-48 hours.
Is it load shedding or a power outage in Buamja?
If your power is off outside the published load shedding schedule, Buamja is likely experiencing an unplanned outage - a fault, cable theft or equipment failure - not load shedding.
Click here to join our telegram channel and stay up to date with load shedding and related news!