Power Outage in Klipfontein, Johannesburg

No power outage reported in Klipfontein by City Power
There are 34 active power outages in other Johannesburg areas.
Last checked: 3m ago
Resident reports ยท community signal
Power off in Klipfontein? Tell neighbours so others know.

Other outages in this area

Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Klipfontein directly.

Johannesburg Power Outages Today6 active

Updated 3m ago
๐Ÿ”ง Investigating3h ago- Midrand
The test branch team has been requested to assist with locating the fault affecting customers on Hereford Drive and Greenstone Drive.
Greenstone Hill
ETA: Fri, 21 Aug, 17:00source
Timeline (2 updates)
  1. Update - Fri, 21 Aug, 06:46
    One load center is currently off at Greenstone Hill Switching Station, affecting customers in Hereford Drive and Greenstone Drive. Further investigations will be conducted today due to faulty testing equipment.
    source
  2. Update - Fri, 21 Aug, 08:32
    The test branch team has been requested to assist with locating the fault affecting customers on Hereford Drive and Greenstone Drive.
    source
๐Ÿ”ง Investigating1d ago- Midrand
Our team will investigate the power outage affecting customers on 16th Road and Old Pretoria Road in Randjespark after completing a task at James Crescent Switching Station.
RandjesparkPretoriaStaugh Voster
ETA: Fri, 21 Aug, 17:00source
Timeline (2 updates)
  1. Reported - Thu, 20 Aug, 08:25
    An unplanned power outage is affecting customers on 16th Road, Old Pretoria Road, and New Road in Randjespark.
    source
  2. Update - Fri, 21 Aug, 07:26
    Our team will investigate the power outage affecting customers on 16th Road and Old Pretoria Road in Randjespark after completing a task at James Crescent Switching Station.
    source
๐Ÿ”ง Investigating20h ago- Midrand
Eskom successfully tested the transformer and cables last night; further tests will be conducted today before power supply can be restored to customers in Rabie Ridge Extension 4 and Commercia Extension 9.
Rabie RidgeCommerciaHalfway HouseAllandalehouseAllendale
ETA: Fri, 21 Aug, 17:00source
Timeline (5 updates)
  1. Reported - Thu, 20 Aug, 13:57
    An unplanned power outage is affecting customers in Rabie Ridge Extension 4 and Commercia Extension 9. Operators have been notified and will attend to the outage.
    source
  2. Reported - Thu, 20 Aug, 15:11
    An unplanned power outage is affecting customers in Rabie Ridge Extension 4 and Commercia Extension 9, and operators have been notified to attend to it.
    source
  3. Update - Thu, 20 Aug, 18:57
    Our technical team will attend to the outage affecting Halfway House after completing the task at hand at Allandale Substation.
    source
  4. Update - Thu, 20 Aug, 22:23
    Eskom has tested the transformer and cables for Allendale Substation, which passed, and will return in the morning to test the REF circuit, affecting Rabie Ridge Extension 4 and Commercia Extension 9.
    source
  5. Update - Fri, 21 Aug, 07:25
    Eskom successfully tested the transformer and cables last night; further tests will be conducted today before power supply can be restored to customers in Rabie Ridge Extension 4 and Commercia Extension 9.
    source
โšก Active3h ago- Midrand
Our team is currently onsite investigating the cause of an outage affecting customers on Old Pretoria Road, Cynthia Court, and Tonetti Street in Halfway House.
Halfway HousehousePretoria
ETA: Fri, 21 Aug, 17:00source
๐Ÿ”ง Investigating1d ago- Midrand
Repairs on a double fault at Westfield Substation, affecting customers in Greenstone, Modernfontein, and Longmeadow Business Estate along Lake Road, are underway, with 91% of power supply restored.
ModderfonteinWestFieldLongmeadow Business EstateLongmeadow
Cause: Equipment faultETA: Fri, 21 Aug, 14:00source
Timeline (7 updates)
  1. Reported - Wed, 19 Aug, 16:20
    A power interruption is affecting customers in Modderfontein and Greenstone, and operators will be dispatched to investigate.
    source
  2. Reported - Wed, 19 Aug, 18:46
    Operators are investigating the cause of an outage at Westfield Substation affecting Modderfontein, Greenstone, and possible surrounding areas.
    source
  3. Reported - Wed, 19 Aug, 19:36
    An incomer has tripped at Westfield Substation, affecting customers in Modderfontein and Greenstone. Operators and the protection team are investigating the cause.
    source
  4. Update - Wed, 19 Aug, 22:27
    Approximately 91% of power supply has been restored from Westfield Substation, but the team is unable to locate and repair the remaining percentage due to faulty equipment.
    source
  5. Update - Thu, 20 Aug, 06:31
    Approximately 91% of power has been restored from Westfield Substation, with two load centers remaining off due to faulty equipment, affecting customers in Modderfontein and Greenstone.
    source
  6. Update - Thu, 20 Aug, 10:17
    Approximately 91% of the power supply has been restored to Modderfontein and Greenstone, with full restoration anticipated by 22:00 tonight due to faulty equipment and a cable fault.
    source
  7. Update - Fri, 21 Aug, 06:40
    Repairs on a double fault at Westfield Substation, affecting customers in Greenstone, Modernfontein, and Longmeadow Business Estate along Lake Road, are underway, with 91% of power supply restored.
    source
Upcoming Planned Power Outages
๐Ÿ“… Plannedin 6 days- Midrand
A planned power interruption at Greenstone Hill switching station, initially scheduled for Wednesday, 20 August 2026, has been rescheduled for Thursday, 27 August 2026, from 08h00 until 16h00.
Stone CloseHereford RoadStoneridge DriveEmerald BoulevardGreenstone Hill
Outage details
Cause: Planned maintenanceETA: Thu, 27 Aug, 16:00source
Source: @CityPowerJhbAuto-updated every 10 minutes

Report a Power Outage in Klipfontein

Is your power off in Klipfontein? Report it to City Power so they can dispatch a team.

Tired of finding out the hard way? Get notified when there's a power outage in Klipfontein.

When Will Electricity Come Back in Klipfontein?

How long a power outage in Klipfontein takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.

Unplanned fault
Most outages in Klipfontein fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
Cable theft
12-48 hours to repair, especially if specialised equipment is needed.
Planned work
City Power notifies Klipfontein residents in advance. Usually 6-10 hours during the day.

Power Outage History for Klipfontein (Last 90 Days)

City Power reported 3 outages affecting Klipfontein in the last 90 days. Most faults traced back to the Klipfontein Substation substation (3 of 3). The most common cause was emergency maintenance.

DateDurationSubstationCauseAlso affected
11 Aug 202616.6hKlipfontein Substationequipment fault-
20 Jun 2026-Klipfontein Substationemergency maintenance-
20 Jun 2026-Klipfontein Substationemergency maintenance-

See the full Johannesburg power outage history โ†’

What to Do During a Power Outage in Klipfontein

Quick checklist to follow while waiting for City Power to restore power in Klipfontein.

  • Switch off appliances at the wall to prevent damage from power surges when electricity returns.
  • Leave one light switched on so you know when power is restored.
  • Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
  • Use battery-powered lights instead of candles to reduce fire risk.
  • Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.

Frequently Asked Questions About Power Outages in Klipfontein

Is there a power outage in Klipfontein right now?

No power outage is currently reported by City Power for Klipfontein, Johannesburg. This page updates every 10 minutes with live data from City Power. If your power is off, report it by calling 0114907484 / 0860562874.

How do I report a power outage in Klipfontein?

Call City Power on 0114907484 / 0860562874 to report a power outage in Klipfontein. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.

How long do power outages last in Klipfontein?

Most unplanned power outages in Klipfontein are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.

When will the electricity be back on in Klipfontein?

City Power has not logged an active electricity outage in Klipfontein right now. If your power is off, the issue may be local to your street or property. Call 0114907484 / 0860562874 or check this page again - it updates every 10 minutes with live electricity restoration data from City Power.

Is it load shedding or a power outage in Klipfontein?

If your power is off outside the load shedding schedule, Klipfontein is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Klipfontein load shedding schedule

What number do I call for City Power in Klipfontein?

Call City Power on 0114907484 / 0860562874 for power outages in Klipfontein. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.