Power Outage in Kensington Ext, Johannesburg
Power Outages Affecting Kensington Ext1 active
Updated 8m ago- Reported - Mon, 05 Oct, 17:25An outage affecting customers in Sovereign Parks, Reddam, Bedford Gate, and Smith Street in Kensington has been reported, and operators will be dispatched to investigate.source
- Reported - Mon, 05 Oct, 20:52Due to unforeseen circumstances, the team will investigate the cause of an outage affecting customers in Sovereign Parks, Reddam, Bedford Gate, and Smith Street in Kensington in the morning.source
- Reported - Tue, 29 Sept, 13:34An outage is affecting customers in Kensington and Bezuidenhout Valley, and operators will be dispatched to investigate the cause.source
- Update - Wed, 30 Sept, 15:15Repairs are in progress at Observatory Substation, and 95% of the power supply has been restored to customers in Kensington and Bezuidenhout Valley.source
- Restored - Thu, 01 Oct, 14:26Power supply has been fully restored to customers on Somerset Road in Kensington, following an outage caused by a faulty cable.source
- Restored - Thu, 01 Oct, 14:29Power supply has been fully restored to customers in Kensington and Bezuidenhout Valley, following an outage caused by a faulty cable.source
Report a Power Outage in Kensington Ext
Is your power off in Kensington Ext? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Kensington Ext?
How long a power outage in Kensington Ext takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Most outages in Kensington Ext fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Kensington Ext residents in advance. Usually 6-10 hours during the day.
Power Outage History for Kensington Ext (Last 90 Days)
City Power reported 8 outages affecting Kensington Ext in the last 90 days. Most faults traced back to the Observatory Substation substation (3 of 8). The most common cause was planned maintenance.
| Date | Time to restoration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 22 Sept 2026 | - | Sebenza Substation | planned maintenance | Far East Bank, Alexandra Extensions 1, Alexandra Extensions 3, Alexandra Extensions 4 +91 more |
| 19 Sept 2026 | - | - | - | Bruma |
| 16 Sept 2026 | - | - | - | Malvern |
| 31 Jul 2026 | - | Harry Gwala Primary School | sabotage incident | Malvern, Randpark, Hurst Hill |
| 16 Jul 2026 | 1.9d | Observatory Substation | cable fault | Observatory |
| 15 Jul 2026 | 3.6h | Sebenza Substation | wildfire | Alexandra, Kew, Lyndhurst, Savoy +26 more |
| 14 Jul 2026 | - | Observatory Substation | chamber fire | Observatory |
| 11 Jul 2026 | - | Observatory Substation | - | Observatory |
Time to restoration is measured from when the outage was first reported, not from when it began.
What to Do During a Power Outage in Kensington Ext
Quick checklist to follow while waiting for City Power to restore power in Kensington Ext.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Kensington Ext
Is there a power outage in Kensington Ext right now?
Yes, there is currently a power outage reported in Kensington Ext, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.
How do I report a power outage in Kensington Ext?
Call City Power on 0114907484 / 0860562874 to report a power outage in Kensington Ext. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Kensington Ext?
Most unplanned power outages in Kensington Ext are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.
When will the electricity be back on in Kensington Ext?
For the active outage affecting electricity in Kensington Ext, see the live update at the top of this page for City Power's latest restoration estimate. Most unplanned electricity outages in Kensington Ext restore within 4-8 hours. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.
Is it load shedding or a power outage in Kensington Ext?
If your power is off outside the load shedding schedule, Kensington Ext is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Kensington Ext load shedding schedule
What number do I call for City Power in Kensington Ext?
Call City Power on 0114907484 / 0860562874 for power outages in Kensington Ext. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
- Kensington Ext Load Shedding Schedule
- All Johannesburg Power Outages Today
- Johannesburg Power Outage History
- Power Outage Information South Africa
Nearby Areas
Click here to join our telegram channel and stay up to date with load shedding and related news!