Power Outage in Kensington B, Johannesburg
Power Outages Affecting Kensington B3 active
Updated 22m ago
- Update - Mon, 06 Jul, 16:41Planned maintenance at Sebenza Substation is ongoing, affecting Bezuidenhout Valley, Kensington, Bellevue, Kensington Extension, Bezuidenhout Valley East, Kensington Extension 3, Doornfontein, Observatory North, Cyrildene Central, Langermann Drive, Dewetshof, and Bruma; an immediate trip occurred after restoration attempts, and there is no estimated time for full restoration.source
- Planned - Mon, 06 Jul, 18:55Planned maintenance at Sebenza Substation is affecting power supply, though Observatory Substation's 11kV Feeder Board 1 has been restored while the Kensington Standby Distributor remains affected in various areas.source
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Kensington B directly.
Johannesburg Power Outages Today4 active
Updated 22m ago- Reported - Tue, 07 Jul, 09:17The Precision 11kv Switching Station Distributor at Northriding Substation tripped on earth fault, causing an unplanned power supply interruption to customers in Kya Sand.source
- Update - Tue, 07 Jul, 13:12Our team has restored up to 95% of the power supply to Kya Sand due to a cable fault, with two load centres remaining off until repairs are done.source
- Update - Tue, 07 Jul, 20:04Repairs for customers in Kya Sands have been suspended for the evening due to safety concerns and will resume tomorrow morning.source
- Reported - Sun, 05 Jul, 12:37We are aware of a power outage affecting customers in Bryanston. Operators have been notified and will be dispatched to investigate the cause of the outage.source
- Update - Mon, 06 Jul, 17:44A fault under the tunnel at Bryanston Substation's Main Road Distributor is affecting customers in Bryanston; repair works will begin tomorrow morning.source
- Update - Mon, 06 Jul, 10:42A cable fault has been located at Olievenhout 16 Switching Station's Hunters Distributor, affecting customers in Northriding and Northgate. Repairs are in progress.source
- Update - Mon, 06 Jul, 17:34Repairs have been completed at Olievenhout 16 Switching Station's Hunters Distributor, and the team is finalizing tests before power restoration to customers in Sharonlea. The Estimated Time for Restoration (ETR) is 00h00.source

Report a Power Outage in Kensington B
Is your power off in Kensington B? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Kensington B?
How long a power outage in Kensington B takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Most outages in Kensington B fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Kensington B residents in advance. Usually 6-10 hours during the day.
Power Outage History for Kensington B (Last 90 Days)
City Power reported 10 outages affecting Kensington B in the last 90 days, totalling 58.7 hours without power. Average restoration time was 14.7 hours. Most faults traced back to the Sebenza Substation substation (3 of 10). The most common cause was planned maintenance.
| Date | Duration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 04 Jul 2026 | - | Sebenza Substation | planned maintenance | Kensington Standby, 1089 Bellevue Sub, Kensington Extension Standby, Bezuidenhout Valley East +8 more |
| 20 Jun 2026 | 12.6h | Cleveland Substation | cable fault | Malvern, Cleveland, Kensington South |
| 19 Jun 2026 | - | Cleveland Substation | - | Cleveland, Denver, Kensington South |
| 18 Jun 2026 | - | Sebenza Substation | planned maintenance | Kensington Standby, Kensington Extension Standby, Bezuidenhout Valley East, Kensington Extension 3 +7 more |
| 01 Jun 2026 | - | Sebenza Substation | planned maintenance | Observatory North, Bezuidenhout Valley, Doornfontein Standby, Cyrildene South +8 more |
| 04 May 2026 | - | - | - | Reynolds View, Bertrams, Lorentzville, Troyville |
| 28 Apr 2026 | 21.4h | Cleveland Substation | faulty cable | Malvern, Cleveland, Jeppe East, Denver +1 more |
| 25 Apr 2026 | - | Observatory Substation | repairs in progress | De Wetshof, Observatory, Yeoville, Upper Houghton +5 more |
| 24 Apr 2026 | 0m | Observatory Substation | double faults | De Wetshof, Observatory |
| 22 Apr 2026 | 1d | Observatory Substation | unforeseen circumstances | Bruma, De Wetshof, Cyrildene, Observatory |
What to Do During a Power Outage in Kensington B
Quick checklist to follow while waiting for City Power to restore power in Kensington B.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Kensington B
Is there a power outage in Kensington B right now?
Yes, there is currently a power outage reported in Kensington B, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.
How do I report a power outage in Kensington B?
Call City Power on 0114907484 / 0860562874 to report a power outage in Kensington B. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Kensington B?
Most unplanned power outages in Kensington B are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.
When will the electricity be back on in Kensington B?
For the active outage affecting electricity in Kensington B, see the live update at the top of this page for City Power's latest restoration estimate. Most unplanned electricity outages in Kensington B restore within 4-8 hours. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.
Is it load shedding or a power outage in Kensington B?
If your power is off outside the load shedding schedule, Kensington B is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Kensington B load shedding schedule
What number do I call for City Power in Kensington B?
Call City Power on 0114907484 / 0860562874 for power outages in Kensington B. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.