Power outage in HalfwayHouse on Friday, 20 November 2026 at 01:02
4 updates so far, latest 10h ago
Last checked: 11m ago

Part of the Midrand area.

Resident reports ยท community signal
Power off in HalfwayHouse? 1 report in the last 24 hours.

Power Outages Affecting HalfwayHouse1 active

Updated 11m ago
๐Ÿ”ง Investigating1d ago- Midrand
Approximately 80% of power has been restored to customers along Church Street, Halfway House, and Halfway Gardens, with the remaining 20% affecting Suttie Road and Richards Drive, as the test branch team is locating a cable fault at Grand Central Substation.
Halfway HouseHalfway Gardens
Cause: Faulty cablesource
Timeline (4 updates)
  1. Reported - Fri, 20 Nov, 01:02
    A power interruption at Grand Central Substation is affecting customers in Church Street, Halfway House, and Halfway Gardens, with the day shift team investigating unexpected challenges.
    source
  2. Reported - Fri, 20 Nov, 09:19
    Operators are investigating a power outage affecting customers along Church Street, Halfway Gardens, and Halfway House, reported in the early hours of this morning, November 20, 2026.
    source
  3. Update - Fri, 20 Nov, 12:13
    Approximately 80% of the power supply has been restored to customers along Church Street, Halfway House, and Halfway Gardens, with the remaining 20% affecting Suttie Road and Richards Drive due to a cable fault.
    source
  4. Update - Fri, 20 Nov, 14:20
    Approximately 80% of power has been restored to customers along Church Street, Halfway House, and Halfway Gardens, with the remaining 20% affecting Suttie Road and Richards Drive, as the test branch team is locating a cable fault at Grand Central Substation.
    source
Source: @CityPowerJhbAuto-updated every 10 minutes

What happened

Cause given by City Power: cable fault

Cable faults across City Power's network usually took about 15 hours to restore. Half of the 882 on record took between 4 and 34 hours (records since April 2026).

Measured from when the outage was first reported to when City Power confirmed power was restored, so the actual time without power may differ. A guide from past outages, not an estimate for this one.

This page also covers outages in Halfwayhouse Ext 41.

Report a Power Outage in HalfwayHouse

Is your power off in HalfwayHouse? Report it to City Power so they can dispatch a team.

Tired of finding out the hard way? Get notified when there's a power outage in HalfwayHouse.

When Will Electricity Come Back in HalfwayHouse?

How long a power outage in HalfwayHouse takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.

Unplanned fault
Typical unplanned outage across Johannesburg: about 10 hours. About half are back within 8 hours; about a third take more than a day.
Cable theft
12-48 hours to repair, especially if specialised equipment is needed.
Planned work
City Power notifies HalfwayHouse residents in advance. Usually 6-10 hours during the day.

Power Outage History for HalfwayHouse (Last 90 Days)

City Power reported 4 outages affecting HalfwayHouse in the last 90 days. Most faults traced back to the Waterfall Substation substation (2 of 4). The most common cause was upstream trip.

DateTime to restorationSubstationCauseAlso affected
02 Nov 20269.6hWaterfall Substationupstream tripHalfway House, Vorna Valley, Allandale
21 Sept 2026-Waterfall Substationcable faultHalfway House, Waterfall
21 Sept 2026-James Crescent Switching Station-Halfway House
01 Sept 2026---Halfway House

Time to restoration is measured from when the outage was first reported, not from when it began.

See the full Johannesburg power outage history โ†’

What to Do During a Power Outage in HalfwayHouse

Quick checklist to follow while waiting for City Power to restore power in HalfwayHouse.

  • Switch off appliances at the wall to prevent damage from power surges when electricity returns.
  • Leave one light switched on so you know when power is restored.
  • Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
  • Use battery-powered lights instead of candles to reduce fire risk.
  • Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.

Frequently Asked Questions About Power Outages in HalfwayHouse

Is there a power outage in HalfwayHouse right now?

Yes, there is currently a power outage reported in HalfwayHouse, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.

How do I report a power outage in HalfwayHouse?

Call City Power on 0114907484 / 0860562874 to report a power outage in HalfwayHouse. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.

How long do power outages last in HalfwayHouse?

Measured from City Power's own notices since April 2026, the typical unplanned outage in Johannesburg took about 10 hours from first report to confirmed restoration. About half were back within 8 hours, but about a third took more than a day, usually cable faults or equipment damage. Planned maintenance usually runs within the window City Power announces.

When will the electricity be back on in HalfwayHouse?

For the active outage affecting electricity in HalfwayHouse, see the live update at the top of this page for City Power's latest restoration estimate. Across Johannesburg, the typical unplanned outage took about 10 hours to restore, and about a third took more than a day. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.

Is it load shedding or a power outage in HalfwayHouse?

If your power is off outside the load shedding schedule, HalfwayHouse is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check HalfwayHouse load shedding schedule

What number do I call for City Power in HalfwayHouse?

Call City Power on 0114907484 / 0860562874 for power outages in HalfwayHouse. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.

OurPower is an independent live tracker. We are not affiliated with City Power or the City of Johannesburg. This page reads public information that City Power publishes and translates it into plain language. For official updates, contact City Power on 0114907484 / 0860562874 or citypower.co.za.

Related Pages

Nearby Areas

Subscribe to our telegram channelClick here to join our telegram channel and stay up to date with load shedding and related news!