Power Outage in Ennerdale Ext 5 And 6, Johannesburg
Power Outages Affecting Ennerdale Ext 5 And 62 active
Updated 24m ago- Update - Wed, 18 Nov, 16:38Our team is sourcing a replacement mini-substation for the faulty D19 unit supplying customers in Ennerdale, 4th and 5th Avenue.source
- Update - Thu, 19 Nov, 15:01Our team is finalising the sourcing of a replacement mini-substation for the faulty MSS D19 unit supplying customers on 4th and 5th Avenue in Ennerdale, with replacement to commence once the new unit is delivered.source
- Update - Mon, 16 Nov, 11:39Power supply has been restored to up to 94% of customers in Mid-Ennerdale and Ennerdale Extensions 3 and 5 following an outage caused by a faulty local switch.source
- Reported - Mon, 16 Nov, 16:56City Power is working to restore electricity to customers in Ennerdale Extension 3 and Mid-Ennerdale following a faulty local transformer switch on the Percy 2 Feeder, which supplies these areas from the Ennerdale Substation.source
- Update - Mon, 16 Nov, 20:01Power supply has been restored up to 94% to customers in Mid-Ennerdale and Ennerdale Extensions 3 and 5, following an outage caused by a faulty local switch.source
- Reported - Tue, 17 Nov, 07:21An outage affecting customers in Ennerdale Extension 8 at Ennerdale Substation was reported today, 17 November 2026, and operators have been dispatched to investigate.source
- Update - Tue, 17 Nov, 21:56Tests at Ennerdale Substation revealed a failed local transformer switch that needs replacement, with restoration efforts at 94% for customers in Mid-Ennerdale.source
- Update - Wed, 18 Nov, 20:45Ennerdale Minisubstation D19 failed tests and needs to be replaced, affecting customers in Ennerdale, 4th, and 5th Avenue.source
- Reported - Mon, 16 Nov, 12:57An outage affecting customers in Ennerdale, Finetown, Lenasia South, and Mid-Ennerdale has been reported and operators will investigate.source
- Update - Mon, 16 Nov, 20:07Power has been restored to most areas, except for Lenasia South Ext 7 affected by Lunar Substation, where a team is on site.source
- Restored - Tue, 17 Nov, 00:11Power has been restored at Lunar Substation to customers in Lenasia South Ext 7, after an outage caused by a tree falling on overhead lines.source
- Reported - Sun, 15 Nov, 16:05An outage at Ennerdale Substation is affecting customers in Ennerdale Ext 5 and Ennerdale Ext 8, with operators on site investigating the cause.source
- Restored - Sun, 15 Nov, 16:36Power has been fully restored to customers in Ennerdale Ext 5 and Ennerdale Ext 8 following an outage caused by a faulty cable.source
- Reported - Thu, 12 Nov, 16:19An outage at Ennerdale Substation is affecting customers in Mid-Ennerdale and Ennerdale Extensions 3 and 5, and operators have been dispatched to investigate.source
- Update - Fri, 13 Nov, 03:2298% of supply has been restored from Ennerdale Switching Station, but two load centers remain off due to a cable fault, affecting customers in Mid-Ennerdale and Ennerdale Extensions 3 and 5.source
- Update - Fri, 13 Nov, 09:49Power supply has been restored up to 98% to customers in Mid-Ennerdale, Ennerdale Extensions 3 and 5, following an outage caused by a cable fault. Two load centres will remain off until the fault has been located and repaired.source
- Update - Sat, 14 Nov, 13:13Power supply has been restored to 98% of customers in Mid-Ennerdale and Ennerdale Extensions 3 and 5 following a cable fault, with a contractor on site conducting repairs.source
- Update - Sat, 14 Nov, 19:37Repairs on the faulty cable at Ennerdale Substation are complete, and operators have been requested to commence with the restoration process, which remains at 98% for Mid-Ennerdale and Ennerdale Extensions 3 and 5.source
- Restored - Sat, 14 Nov, 20:17Full power supply has been restored at Ennerdale Substation to Mid-Ennerdale and Ennerdale Extensions 3 and 5, following a cable fault reported on Thursday, 12 November 2026.source
What happened
Cause given by City Power: equipment fault
Unplanned outages in Ennerdale Ext 5 And 6 usually took about 27 hours to restore. Half of the 20 on record took between 19 hours and 2 days (records since April 2026).
Measured from when the outage was first reported to when City Power confirmed power was restored, so the actual time without power may differ. A guide from past outages, not an estimate for this one.
Report a Power Outage in Ennerdale Ext 5 And 6
Is your power off in Ennerdale Ext 5 And 6? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Ennerdale Ext 5 And 6?
How long a power outage in Ennerdale Ext 5 And 6 takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Typical unplanned outage across Johannesburg: about 10 hours. About half are back within 8 hours; about a third take more than a day.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Ennerdale Ext 5 And 6 residents in advance. Usually 6-10 hours during the day.
Power Outage History for Ennerdale Ext 5 And 6 (Last 90 Days)
City Power reported 17 outages affecting Ennerdale Ext 5 And 6 in the last 90 days. Most faults traced back to the Ennerdale Substation substation (12 of 17). The most common cause was cable fault.
| Date | Time to restoration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 07 Nov 2026 | - | Ennerdale Substation | cable fault | Mid-Ennerdale, Ennerdale Ext 6 |
| 25 Oct 2026 | 23.3h | Ennerdale Substation | cable theft | Lawley, Ennerdale Ext 9, Mid-Ennerdale, Ennerdale Ext 3 |
| 24 Oct 2026 | - | Ennerdale Substation | cable fault | Mid Ennerdale, Ennerdale Ext 3 |
| 21 Oct 2026 | 2.3d | Ennerdale Substation | cable fault | Ennerdale Ext 1, Ennerdale Ext 2 |
| 16 Oct 2026 | - | Ennerdale Substation | cable fault | - |
| 04 Oct 2026 | 1.3d | Ennerdale Substation | cable fault | Lawley Ext 1, Lawley |
| 27 Sept 2026 | 20.3h | Ennerdale Substation | vandalism | Lawley |
| 27 Sept 2026 | 21.5h | Lenasia Substation | cable fault | Lenasia, Lenasia South, Lenasia Extension 4 |
| 16 Sept 2026 | - | Ennerdale Substation | cable fault | - |
| 15 Sept 2026 | - | Ennerdale Substation | cable fault | Ennerdale Ext 9, Lawley |
Time to restoration is measured from when the outage was first reported, not from when it began.
What to Do During a Power Outage in Ennerdale Ext 5 And 6
Quick checklist to follow while waiting for City Power to restore power in Ennerdale Ext 5 And 6.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Ennerdale Ext 5 And 6
Is there a power outage in Ennerdale Ext 5 And 6 right now?
Yes, there is currently a power outage reported in Ennerdale Ext 5 And 6, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.
How do I report a power outage in Ennerdale Ext 5 And 6?
Call City Power on 0114907484 / 0860562874 to report a power outage in Ennerdale Ext 5 And 6. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Ennerdale Ext 5 And 6?
Measured from City Power's own notices since April 2026, the typical unplanned outage in Johannesburg took about 10 hours from first report to confirmed restoration. About half were back within 8 hours, but about a third took more than a day, usually cable faults or equipment damage. Planned maintenance usually runs within the window City Power announces.
When will the electricity be back on in Ennerdale Ext 5 And 6?
For the active outage affecting electricity in Ennerdale Ext 5 And 6, see the live update at the top of this page for City Power's latest restoration estimate. Across Johannesburg, the typical unplanned outage took about 10 hours to restore, and about a third took more than a day. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.
Is it load shedding or a power outage in Ennerdale Ext 5 And 6?
If your power is off outside the load shedding schedule, Ennerdale Ext 5 And 6 is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Ennerdale Ext 5 And 6 load shedding schedule
What number do I call for City Power in Ennerdale Ext 5 And 6?
Call City Power on 0114907484 / 0860562874 for power outages in Ennerdale Ext 5 And 6. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
- Ennerdale Ext 5 And 6 Load Shedding Schedule
- All Johannesburg Power Outages Today
- Johannesburg Power Outage History
- Power Outage Information South Africa
Nearby Areas
Click here to join our telegram channel and stay up to date with load shedding and related news!