Power Outage in Benrose, Johannesburg
Power Outages Affecting Benrose1 active
Updated 3m ago- Update - Mon, 18 May, 10:13An outage is affecting customers in Benrose, Denver, and Malvern, with operators on site investigating the cause.source
- Update - Mon, 18 May, 13:42The team is on site busy with fault finding for an outage affecting Benrose, Denver, and Malvern.source
- Restored - Wed, 20 May, 12:24Full power supply has been restored to customers in Heriotdale, following an outage caused by a breaker tripping.source
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Benrose directly.
Johannesburg Power Outages Today1 planned
Updated 3m ago
Report a Power Outage in Benrose
Is your power off in Benrose? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Benrose?
How long a power outage in Benrose takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Most outages in Benrose fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Benrose residents in advance. Usually 6-10 hours during the day.
Power Outage History for Benrose (Last 90 Days)
City Power reported 10 outages affecting Benrose in the last 90 days, totalling 205.1 hours without power. Average restoration time was 34.2 hours. Most faults traced back to the Cleveland Substation substation (6 of 10). The most common cause was faulty cable.
| Date | Duration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 13 May 2026 | 59m | Cleveland Substation | overload | Denver, Cleveland |
| 03 May 2026 | 4.6d | Cleveland Substation | faulty cable | Denver, Cleveland |
| 30 Apr 2026 | - | Prospect Substation | planned maintenance | Heriotdale, Denver, Cleveland |
| 28 Apr 2026 | 21.4h | Cleveland Substation | faulty cable | Malvern, Kensington, Cleveland, Jeppe East +1 more |
| 24 Apr 2026 | - | Kazerne Switching Station | - | Droste Park, Kazerne, Doornfontein |
| 20 Apr 2026 | 49m | Cleveland Substation | protection failure | Denver, Cleveland, Kensington |
| 20 Apr 2026 | - | Cleveland Substation | overloading | Denver, Cleveland, Kensington, Malvern +2 more |
| 17 Apr 2026 | 1.8d | Prospect Substation | cable fault | Cleveland, Heriotdale, Denver |
| 17 Apr 2026 | - | Cleveland Substation | cable fault | Malvern, Denver |
| 14 Apr 2026 | 1.2d | Cleveland | fault | Denver, Malvern, Droste Park, Heriotdale |
What to Do During a Power Outage in Benrose
Quick checklist to follow while waiting for City Power to restore power in Benrose.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Benrose
Is there a power outage in Benrose right now?
Yes, there is currently a power outage reported in Benrose, Johannesburg. City Power is aware and working on restoration. Check the live updates above for the latest status and estimated restoration time.
How do I report a power outage in Benrose?
Call City Power on 0114907484 / 0860562874 to report a power outage in Benrose. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Benrose?
Most unplanned power outages in Benrose are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.
When will the electricity be back on in Benrose?
For the active outage affecting electricity in Benrose, see the live update at the top of this page for City Power's latest restoration estimate. Most unplanned electricity outages in Benrose restore within 4-8 hours. Call 0114907484 / 0860562874 to confirm the ETA for your specific street.
Is it load shedding or a power outage in Benrose?
If your power is off outside the load shedding schedule, Benrose is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Benrose load shedding schedule
What number do I call for City Power in Benrose?
Call City Power on 0114907484 / 0860562874 for power outages in Benrose. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
Click here to join our telegram channel and stay up to date with load shedding and related news!